Annual Road Program

Each year, the Department of Public Works reviews street conditions to develop its annual road reconstruction program. The program is based on a number of factors such as street and sidewalk conditions as well as past and planned utility work. The proposed program is presented to the City Council Committee on Public Works, which then reviews and makes recommendations to the entire City Council.

2026 Annual Road Program

THIS SECTION IS BEING UPDATED. CHECK BACK SOON FOR MORE INFORMATION.

2026 Annual Road Program Public Works Subcommittee Presentation - October 22, 2025 (PDF)

Roads affected by the FY26 Annual Road Program have undergone necessary utility work and will now undergo full reconstruction and improvement to meet Watertown's Complete Streets standards. These improvements include repaving and re-striping, new granite curbing, traffic flow and safety enhancements, stormwater management infrastructure, and beautification. More information and specific dates will be sent to affected abutters at least 5 days before the start of work. All dates and durations are estimates and subject to change due to weather or unforeseen circumstances.

FY26 Phase 1

Engineering/design: Bobrek Engineering and Construction 

Contractor: Newport Construction Corporation

StreetStatusExpected StartExpected EndPlan/DesignAbutter Notice
George StreetNot yet startedEarly JulyEarly September

Bromfield StreetOngoing, construction has startedLate AprilLate June

Mangano CourtNot yet startedEarly SeptemberEarly October

Grandview AvenueNot yet startedTBDTBD

Dwight StreetNot yet startedEarly OctoberMid-December

Chestnut StreetNot yet startedEarly/mid-NovemberMid-December

Barrett CourtNot yet startedEarly/mid-NovemberMid-December


FY26 Phase 2

Engineering/design: Bobrek Engineering and Construction 

Contractor: TBD, bid currently out

Street
Status
Expected Start
Expected End
Plan/Design
Abutter Notice
Pequosette StreetNot yet startedTBDTBD

North Irving ParkNot yet startedEarly OctoberMid-December

South Irving ParkNot yet startedEarly OctoberMid-December

Royal StreetNot yet startedEarly OctoberMid-December

Green StreetNot yet startedEarly JuneMid-October

Chestnut StreetNot yet startedEarly/mid-NovemberMid-December

Barrett CourtNot yet startedEarly/mid-NovemberMid-December


FY26 Phase 3

Engineering/design: Horsely Witten Group

Contractor: TBD, bid expected to be out by July 1, 2026

Street
Status
Expected Start
Expected End
Plan/Design
Abutter Notice
Cottage StreetIn design phaseTBDTBD

Sawin StreetIn design phaseTBDTBD

Rifle CourtIn design phaseTBDTBD

Lyons StreetIn design phaseTBDTBD

Sexton StreetIn design phaseTBDTBD

Cottage LaneIn design phaseTBDTBD

Molloy StreetIn design phaseTBDTBD

Hearn StreetIn design phaseTBDTBD

Winter StreetIn design phaseTBDTBD



2025 Annual Road Program

2025 Annual Road Program Public Works Subcommittee Presentation - October 28, 2024

2024 Annual Road Program

2023 Annual Road Program

Francis Street, Bates Road, Bates Road East, Bradshaw Street, Essex Street, and Nash Street have been selected for full reconstruction as part of the City’s 2023 Annual Road Program. Roadway reconstruction entails removing and replacing the existing roadway, regrading of the road, and rehabilitation of the roadway base.  Per City Council directive, roads that undergo full reconstruction also receive granite curb installation, new concrete sidewalks and driveway aprons, and ADA-compliant accessible ramps.

Schedule Updates:

Additional Information:

Additional Documents:

Previous Years

2022 Annual Road Program

The following streets have been selected for full reconstruction as part of the City’s 2022 Annual Road Program. Roadway reconstruction entails removing and replacing the existing roadway, regrading of the road, and rehabilitation of the roadway base.  Per City Council directive, roads that undergo full reconstruction also receive granite curb installation, new concrete sidewalks and driveway aprons, and ADA-compliant accessible ramps. 

Additional Information:

2021 Annual Road Program

The following streets have been selected for full reconstruction as part of the Citys 2021 Annual Road Program. Roadway reconstruction entails removing and replacing the existing roadway, regrading of the road, and rehabilitation of the roadway base.  Per Town Council directive, roads that undergo full reconstruction also receive granite curb installation, new concrete sidewalks and driveway aprons, and ADA-compliant accessible ramps. 

Alden Road: Concept Plan | Neighborhood Letter

Elmwood Ave: Concept Plan | Neighborhood Letter

Gertrude Street: Concept Plan | Neighborhood Letter

Goldie Street: Concept Plan | Neighborhood Letter

Grandview Ave (Copeland Street to Chapman Street): Concept Plan | Neighborhood Letter

Hazel Street (Quimby Street to Dexter Ave): Concept Plan | Neighborhood Letter

Sheldon Road: Concept Plan | Neighborhood Letter

Residential Driveway Information

Guide to the Planting Strip

Winter Maintenance and Deicing

Presentation to Public Works Subcommittee September 24, 2021

2020 Annual Road Program

Scope of Work

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

Presentation to Public Works Subcommittee August 22, 2019

2020 Annual Road Program FAQs

Residential Driveway Information

2019 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

Presentation to Public Works Subcommittee December 18, 2018

2019 Annual Road Program FAQs

2018 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Edgecliff Road
  • Westland Road and Woodleigh Road
  • Everett Avenue (Bartlett to Palfrey)
  • Malden Street
  • Priest Road
  • Arden Road

2019 Road Presentation Priest Road

Presentation To Public Works Subcommittee October 18, 2018

2017 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Hovey Street
  • Cushman Street
  • Waltham Street(Rosedale Road to Bridge Street)
  • Knowles Road, including Holly Street and Whitcomb Avenue
  • Irma Avenue

Presentation To Public Works Subcommittee October 27, 2016

2016 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Edenfield Avenue( Main to Waverly)
  • Hillside Road (Belmont Street to Hillcrest Circle)
  • Hillcrest Circle
  • Grenville Road
  • Merrill Road
  • Purvis Street

Presentation To Public Works Subcommittee February 4, 2016